A stamped concrete patio costs $15.00 per square foot installed in 2026, dropping to $14.25/SF on pours over 500 square feet. A 400 SF patio runs $6,000; a 600 SF patio runs $8,550.
Those are field-tested rates from real Dallas–Fort Worth projects — not crowdsourced national averages. Here's what drives the number, how stamped compares to every other finish, and when it's the wrong call.
Stamped Concrete Patio Cost by Size
| Patio Size | Rate | Installed Cost |
|---|---|---|
| 200 SF (small) | $15.00/SF | $3,000 |
| 300 SF | $15.00/SF | $4,500 |
| 400 SF (typical) | $15.00/SF | $6,000 |
| 500 SF | $14.25/SF | $7,125 |
| 600 SF (large) | $14.25/SF | $8,550 |
| 800 SF | $14.25/SF | $11,400 |
Volume pricing kicks in at 500 SF. Once a project crosses that line, crews mobilize more efficiently — the truck is already there, the forms are set, the pour team is on-site — so the rate drops $0.75/SF across every finish type.
These prices include prep, forming, pour, pattern stamping, and basic sealing.
Stamped Concrete Driveway Cost
Driveways are bigger than patios, so they almost always price at the volume rate:
- 2-car driveway (600 SF): $8,550 at $14.25/SF
- Extended / 3-car driveway (800 SF): $11,400 at $14.25/SF
- Long approach drive (1,000 SF): $14,250 at $14.25/SF
One caution on driveways specifically: stamped patterns are less slip-resistant than a broom finish, and they take vehicle traffic and tire scrub that a patio never sees. Many crews will recommend broom finish for the drive surface and save stamped for the walkway and entry apron, where it's actually seen. That's a $8.00/SF vs $15.00/SF decision — on a 600 SF drive, $4,350 saved.
Every Concrete Finish, Priced — DFW 2026
Stamped is the most expensive of the five finishes. Here's the full lineup:
| Finish | Standard Rate | Volume Rate (500+ SF) |
|---|---|---|
| Broom Finish | $8.00/SF | $7.25/SF |
| Salt / Colored | $10.00/SF | $9.25/SF |
| Exposed Aggregate | $11.00/SF | $10.25/SF |
| Stained Concrete | $11.00/SF | $10.25/SF |
| Stamped Concrete | $15.00/SF | $14.25/SF |
For the same 400 SF patio, broom finish costs $3,200 and stamped costs $6,000 — a $2,800 difference. That gap is the whole decision, and it's why it pays to know all five before committing.
Is Stamped Concrete Cheaper Than Natural Stone?
Yes, by a wide margin. Stamped concrete reproduces flagstone, brick, or slate patterns for $15/SF. The real stone hardscape it imitates runs $30+/SF — double, before you account for the joints, settling, and weed growth that come with individually set stone.
That's the core argument for stamped: the look of stone, one continuous pour, half the price.
When Stamped Is Worth It
- You want the stone look without the stone budget
- The patio connects to an outdoor kitchen where the finish is visible and permanent
- You're in a neighborhood like Southlake or Colleyville where curb appeal moves the appraisal
When to Save Your Money
Broom finish at $8.00/SF is the right call for:
- Side-yard utility slabs and equipment pads
- Driveway surfaces, where traction matters more than pattern
- Any area that ends up under an outdoor kitchen structure or covered by pavers
- Budget-conscious projects in lower-cost markets like Arlington (avg $7,200) or Fort Worth (avg $7,800), where the savings are better spent on the kitchen itself
The most common overspend we see: choosing stamped for a slab that the kitchen structure will mostly cover anyway. Broom under the kitchen, stamped on the visible patio, is almost always the better split.
Pattern Choice Doesn't Change the Price
pAIsa prices 74 stamp patterns across stone, slate, brick, and wood-plank looks. Pattern selection does not change the $15.00/SF rate — ashlar slate costs exactly what random stone costs. Choose on looks, not budget.
Does Cost Vary by City?
The rates above apply across the DFW metro. What actually varies is permits and soil:
- Dallas — permit fees run $75–$300 depending on neighborhood. Stamped is the finish here at 34% of selections.
- Keller — clay-heavy soil may require a 6" base instead of 4" (+$0.50/SF)
- Fort Worth — largest service area, most competitive crew availability
- Frisco — newer subdivisions often sit on compacted fill that's cheaper to prep
- Plano — HOA review may restrict finish type
- Arlington — strong demand for stamped on covered patios
Bundle the Pour and Save
If you're planning a patio and a driveway, quote them together. A 400 SF patio plus a 400 SF driveway poured as one 800 SF job hits the volume rate: $5,800 in broom finish at $7.25/SF, versus $6,400 if quoted as two separate 400 SF jobs at $8.00/SF.
The same logic applies at every finish tier — crossing 500 SF in a single pour is worth planning around.
Pairing Concrete With an Outdoor Kitchen
Most DFW outdoor kitchen projects start with a concrete patio as the foundation. A typical combined project:
1. Concrete patio (400 SF, broom or salt finish): $3,200–$4,000 2. Outdoor kitchen (12 LF straight, Lueders Buff): ~$14,000 3. Total project: ~$17,200–$18,000
The concrete is usually the most affordable part of the build. The average DFW concrete patio project runs $7,900.
FAQ
How much does a stamped concrete patio cost?
$15.00 per square foot installed, dropping to $14.25/SF on pours of 500 SF and up. A 400 SF stamped patio runs $6,000; a 600 SF pour runs $8,550 at the volume rate. Prep, forming, pour, pattern stamping, and sealing are included.What is the average cost of stamped concrete per square foot?
Stamped concrete averages $15.00/SF installed at 2026 rates. That compares to $8.00/SF for broom finish, $10.00/SF for salt or colored, and $11.00/SF for exposed aggregate or stained.How much is stamped concrete for a 400 square foot patio?
$6,000 at the standard $15.00/SF rate. The same patio in broom finish is $3,200 — a $2,800 difference.How much does a stamped concrete driveway cost?
A 600 SF two-car driveway runs $8,550 at the $14.25/SF volume rate; an 800 SF extended drive runs $11,400. Driveways nearly always clear the 500 SF volume threshold. Consider broom finish on the drive surface for better traction and $4,350 in savings on a 600 SF pour.Is stamped concrete cheaper than pavers?
Yes. Stamped concrete costs $15/SF installed while pavers typically run $18–$25/SF in DFW. Stamped is one continuous pour with no settling or weed growth between joints; pavers are easier to repair individually.Is stamped concrete cheaper than natural stone?
Yes, by a wide margin. Stamped concrete at $15/SF mimics flagstone, brick, or slate that would cost $30+/SF as real stone hardscape.How much does stamped concrete cost in Dallas?
The same 2026 rate applies: $15.00/SF standard, $14.25/SF on 500+ SF pours. Stamped is Dallas's most popular finish at 34% of selections — see concrete cost in Dallas, TX for permit fees and neighborhood specifics.How many stamp patterns are available?
pAIsa prices 74 stamp patterns across stone, slate, brick, and wood-plank looks. Pattern choice doesn't change the $15/SF rate.Does stamped concrete cost more than regular concrete?
Yes — nearly double. Standard broom-finish concrete is $8.00/SF; stamped is $15.00/SF. You're paying for the pattern work, release agents, and the extra finishing labor, not for different concrete.Get Your Exact Cost
Every pour is different — square footage, access, base depth, and finish all move the number. Use pAIsa's free AI estimator to get an itemized breakdown for your specific patio or driveway, including finish type and city-specific pricing. It takes about 60 seconds, and there's no contractor visit to schedule first.
For the finish-by-finish comparison across all five options, see the concrete cost per square foot guide.