Short garden wall
18 LF × 2.5 ft (45 SF of face), Lueders Buff 8 Inch
No engineering line: in Flower Mound our quote adds it only for walls over 3 ft tall (over 4 ft measured from the bottom of the footing).
- Stone (face and cap)$652
Lueders Buff 8 Inch, 1.97 t at $330.75/t (Vaquero Stone & Supply supplier price). Tons from the Alliance Materials coverage chart at 35 sq ft per ton: 45 sq ft of wall face is 1.29 t, plus 0.68 t of cap stone
- Drainage core (rip rap)$299
3 t of rip rap at $99.75/t. Sized as a 12 in wide core behind the wall, 18 ft long by 2.5 ft tall, at about 100 lb per cu ft
- Mortar and sand$178
6 bags of mortar at $18.57, plus 1 CY of sand at $67/CY. Mortar is 2 bags per ton of stone ordered; sand follows the mortar (6 bags ÷ 7 bags/CY = 1 CY)
- Foundation$509
Concrete footing 18 ft long, 24 in wide, 12 in deep: 1.33 CY at $150/CY ($200), 36 ft of 3/8 in rebar ($19), excavation and placement ($290)
- Permits and inspections (as required by your city)$600
$600 flat for the city permit and inspection visits, as required by your city
- Project Coordination & Warranty$282
20% on labor and footing ($1,409), covers project management and the warranty. Never charged on stone, permit or engineering
- Price Protection (5%)$33
5% on stone only ($652 of face and cap stone), covers supplier price changes
- Labor$900
45 sq ft of wall face at our $20/sq ft minimum for labor. On a wall this size the permit, drainage core and footing alone come close to the per sq ft wall price, so this wall costs more per sq ft