Cherryblend Chopped outdoor kitchen in Keller, TX
Updated April 2026

Cherryblend Chopped Outdoor Kitchen Cost in Keller, TX

Cherryblend Chopped at $341/ton — average outdoor kitchen in Keller: $19,375. Based on 700+ real estimates from local homeowners.

Cherryblend Chopped
Red / Brown / Cherry · Cherryblend · Vaquero Stone & Supply
Get Your Free Cherryblend Chopped Estimate

How much does a Cherryblend Chopped outdoor kitchen cost in Keller, TX?

A Cherryblend Chopped outdoor kitchen in Keller, TX typically costs $10,656–$34,875, with the average project around $19,375. Cherryblend Chopped runs $341/ton — you'll need approximately 1.5–3.5 tons for a standard kitchen, making the stone material cost $512–$1,194.

$10,656–$34,875
Total Project
$341/ton
Stone Cost
700+
Estimates
In Stock
Availability
Source: 3,578+ DFW estimates by pAIsaLocalLast updated: April 2026
$19,375
Avg Project Cost
$341
Per Ton
700+
Keller Estimates
3-5 days
Lead Time

About Cherryblend Chopped

Cherryblend Chopped offers the warmest color palette in the DFW stone lineup. Its mix of cherry, brown, and rust creates a distinctive, eye-catching look that sets outdoor kitchens apart.

Pros

  • Most distinctive warm color in DFW
  • Pairs beautifully with brick homes
  • Chopped grade for consistent sizing
  • Eye-catching without being over the top

Cons

  • Cherry tones don't match all homes
  • Limited to warm color palettes
  • Higher price than neutral alternatives

Design Details

Best For
Statement outdoor kitchensWarm-toned homesBrick-accented propertiesRustic premium
Pairs Well With
Tan mortarWarm-toned concreteCopper accentsRich landscaping
Category: Cherryblend
Color: Red / Brown / Cherry
Supplier: Vaquero Stone & Supply
Availability: In Stock

Cherryblend Chopped Kitchen Cost Breakdown — Keller

Estimated costs for a Cherryblend Chopped outdoor kitchen in Keller, TX

ComponentLowHigh
Cherryblend Chopped Stone (1.53.5 tons @ $341/ton)$512$1,194
Labor (construction + foundation)$4,795$15,694
Concrete countertops + slab$1,598$5,231
Appliances (grill, burner, etc.)$2,131$6,975
Total Estimated Range$10,656$34,875

* Estimates based on 700+ real projects in Keller. Actual costs vary by layout (straight, L-shaped, U-shaped), appliance choices, and site conditions. AI-generated estimates — not a binding quote.

Permits in Keller, TX

Outdoor kitchens with gas lines require plumbing and mechanical permits. Most residential patios under 200 SF are exempt.

Office: City of Keller Development Services
Fees: $150-$500 depending on project scope

Cherryblend Chopped in Keller — Frequently Asked Questions

Based on 700+ real estimates from Keller homeowners, a Cherryblend Chopped outdoor kitchen typically costs $10,656–$34,875, with the average around $19,375. The stone material alone runs $512–$1,194 for a standard 10–16 linear foot kitchen.

Cherryblend Chopped currently runs approximately $341 per ton in the Dallas–Fort Worth area. On a typical outdoor kitchen you'll need 1.5–3.5 tons depending on the layout (straight, L-shaped, or U-shaped) and total linear footage.

Cherryblend Chopped is a solid choice for Keller outdoor kitchens. Most distinctive warm color in DFW. It's especially well-suited for Statement outdoor kitchens and Warm-toned homes design styles.

Outdoor kitchens with gas lines require plumbing and mechanical permits. Most residential patios under 200 SF are exempt.

If you're considering alternatives to Cherryblend Chopped, popular options in Keller include Oklahoma Chopped ($315/ton), Smokey Mountain Blue ($341/ton). Each offers a different look and price point while being well-suited for DFW outdoor kitchens.

Get Your Cherryblend Chopped Kitchen Estimate

Free, instant, AI-powered — based on 700+ real Keller projects. No phone calls, no pressure.

Start Your Free Estimate
Cherryblend Chopped Outdoor Kitchen Cost in Keller, TX — $10,656–$34,875 | pAIsa