Cherryblend Chopped outdoor kitchen in Colleyville, TX
Updated April 2026

Cherryblend Chopped Outdoor Kitchen Cost in Colleyville, TX

Cherryblend Chopped at $341/ton — average outdoor kitchen in Colleyville: $24,096. Based on 105+ real estimates from local homeowners.

Cherryblend Chopped
Red / Brown / Cherry · Cherryblend · Vaquero Stone & Supply
Get Your Free Cherryblend Chopped Estimate

How much does a Cherryblend Chopped outdoor kitchen cost in Colleyville, TX?

A Cherryblend Chopped outdoor kitchen in Colleyville, TX typically costs $13,253–$43,373, with the average project around $24,096. Cherryblend Chopped runs $341/ton — you'll need approximately 1.5–3.5 tons for a standard kitchen, making the stone material cost $512–$1,194.

$13,253–$43,373
Total Project
$341/ton
Stone Cost
105+
Estimates
In Stock
Availability
Source: 3,578+ DFW estimates by pAIsaLocalLast updated: April 2026
$24,096
Avg Project Cost
$341
Per Ton
105+
Colleyville Estimates
3-5 days
Lead Time

About Cherryblend Chopped

Cherryblend Chopped offers the warmest color palette in the DFW stone lineup. Its mix of cherry, brown, and rust creates a distinctive, eye-catching look that sets outdoor kitchens apart.

Pros

  • Most distinctive warm color in DFW
  • Pairs beautifully with brick homes
  • Chopped grade for consistent sizing
  • Eye-catching without being over the top

Cons

  • Cherry tones don't match all homes
  • Limited to warm color palettes
  • Higher price than neutral alternatives

Design Details

Best For
Statement outdoor kitchensWarm-toned homesBrick-accented propertiesRustic premium
Pairs Well With
Tan mortarWarm-toned concreteCopper accentsRich landscaping
Category: Cherryblend
Color: Red / Brown / Cherry
Supplier: Vaquero Stone & Supply
Availability: In Stock

Cherryblend Chopped Kitchen Cost Breakdown — Colleyville

Estimated costs for a Cherryblend Chopped outdoor kitchen in Colleyville, TX

ComponentLowHigh
Cherryblend Chopped Stone (1.53.5 tons @ $341/ton)$512$1,194
Labor (construction + foundation)$5,964$19,518
Concrete countertops + slab$1,988$6,506
Appliances (grill, burner, etc.)$2,651$8,675
Total Estimated Range$13,253$43,373

* Estimates based on 105+ real projects in Colleyville. Actual costs vary by layout (straight, L-shaped, U-shaped), appliance choices, and site conditions. AI-generated estimates — not a binding quote.

Permits in Colleyville, TX

Colleyville enforces strict residential design standards. Most neighborhoods require HOA pre-approval. Outdoor structures near property lines need site plan review.

Office: City of Colleyville Building Inspections
Fees: $175-$600 depending on project scope

Cherryblend Chopped in Colleyville — Frequently Asked Questions

Based on 105+ real estimates from Colleyville homeowners, a Cherryblend Chopped outdoor kitchen typically costs $13,253–$43,373, with the average around $24,096. The stone material alone runs $512–$1,194 for a standard 10–16 linear foot kitchen.

Cherryblend Chopped currently runs approximately $341 per ton in the Dallas–Fort Worth area. On a typical outdoor kitchen you'll need 1.5–3.5 tons depending on the layout (straight, L-shaped, or U-shaped) and total linear footage.

Cherryblend Chopped is a solid choice for Colleyville outdoor kitchens. Most distinctive warm color in DFW. It's especially well-suited for Statement outdoor kitchens and Warm-toned homes design styles.

Colleyville enforces strict residential design standards. Most neighborhoods require HOA pre-approval. Outdoor structures near property lines need site plan review.

If you're considering alternatives to Cherryblend Chopped, popular options in Colleyville include Oklahoma Chopped ($315/ton), Smokey Mountain Blue ($341/ton). Each offers a different look and price point while being well-suited for DFW outdoor kitchens.

Get Your Cherryblend Chopped Kitchen Estimate

Free, instant, AI-powered — based on 105+ real Colleyville projects. No phone calls, no pressure.

Start Your Free Estimate
Cherryblend Chopped Outdoor Kitchen Cost in Colleyville, TX — $13,253–$43,373 | pAIsa